Horizontal Stabilizer


January 24, 2002
Received empennage kit January 15, 2002. It all starts with two innocent looking boxes. This box contains the small parts bags, ribs, spar doublers,
fiberglass tips and other small misc. parts.

January 25, 2002
The second and larger box contains the skins and spars. Completed inventory
on January 25, 2002. Only a few small parts were missing. Van's shipped them out
and I had them within a week.

January 26, 2002
I couldn't wait to play with the new tools. Van's sends some scrap
material sheets of different thicknesses to practice on. Here's my first attempt
at flush riveting. Not bad for a rookie.
February
1, 2002
Fabricated and drilled angle attach brackets. Fortunately there was enough
stock to make an extra one since I got a little happy with the bench grinder and
took too much material off of one side of one bracket.

February 2, 2002
Cleco'ed, match drilled spars and spar doublers, angle attach brackets,
outboard hinge brackets.

Notice anything wrong with this picture? Duh!! Cleco'ed and match drilled to
the WRONG SIDE of the spar. No harm done but I sure felt stupid. The first of
many times (so I'm told). As other builders have said, READ READ READ then
REREAD the drawings.