Fuselage

March
18, 2005 (First fuselage entry!)
Fuselage kit arrives. Kit was ordered on December 29, 2004, so
it took about 11 weeks for arrival. Both cartons were received in good
condition.


March 20-23, 2005
Opened the two boxes of goodies. Everything was well
packed as usual. I spent about 11 hours on the inventory. Only one small part
was missing, but there was some damage to the right aft fuselage skin.


Kind of hard to see in the pictures, but the damage was along
the bottom edge of the skin. Damage was severe enough that it could not be
worked back into place. I have contacted Van's regarding the damage and I'm
waiting to hear back.
After finishing up the right wing
and a little R&R in Maui, it's time to really get down to business on the
fuselage.
Update on the damaged fuselage skin: After a return phone
call from Van's, they have replaced the damaged aft skin with no problems.
Thanks Van's.

May 15, 22, 2005
Well, I started working on straightening and fluting the
bulkheads but got bored real quick with that so I decided that I would put that
off until I actually needed them. Instead, I gathered up the firewall
components and began work on them. Much more interesting.


May 27, 2005
Fabricated the F-601 angles, spacers and fuel pump doubler plate
and stiffeners. Began the process of cleco'ing to the stainless steel firewall.

May
28, 2005
Completed cleco'ing all remaining firewall components to
firewall and began match drilling all components. The oily film is from the air
drill exhaust.

May
29-30, 2005
Disassembled firewall components and did the necessary deburring,
dimpling and machine countersinking. I'll set aside these parts for now and move
on to the center section bulkhead.