Fuselage


June
28, 2005
Began work on the F-705 bulkhead assembly. This bulkhead
supports the seat backs, seat belts and also provides attach points for the rear
wing spars.


July 3, 8, 9, 2005
Completed match drilling of F-705 bulkhead assembly. Deburred
all pieces and countersank or dimpled where required. Drill holes to accept snap
bushings for rudder cables and wiring.

July
10, 11, 2005
Began fabricating components for the F-711 and F-712 bulkhead assemblies.

July
12, 13, 2005
Finished fabricating and match drilling the F-711 bulkhead
assembly. The F-711 bulkhead provides an attach point for the horizontal
stabilizer.
July 25 - 29, 2005 Off to EAA AIRVENTURE at
OSHKOSH!


July 31, 2005
Completed the fluting, straightening, deburring and match
drilling the halves of the aft bulkheads. Left - F-706, Right - F-707.

Left
- F-708, Right (clockwise from upper left) F-709, F-712, F-710. Completed match
drilling the two halves of the F-712 bulkhead and match drilled the tie aft
tie-down to the bulkhead. Dimpled the bulkhead and machine countersank the
tie-down bar.
