Left Wing


May
23-24, 2003
Rivet 2 center section platenuts to spar. Fabricated, drilled, deburred,
countersank and tapped the left wing tie down bar. The tie down bar gets
platenuts riveted to it, but I will be priming it first.

May
27, 2003
Begin work on left wing rear spar. Cleco'ed spar reinforcement fork, spar
doubler plate and aileron bracket reinforcement plates to rear spar and match
drilled. Cut out hole in rear spar for aileron push rod.

May
28, 2002
Deburred rear spar edges and holes, deburred spar reinforcement plates and
machine countersank where required.
Several
holes along the rear spar flange need to be dimpled now since it will be
difficult to dimple these holes once the spar reinforcement fork is attached to
the spar.
June
4, 2003
Now begins probably one of the most boring but essential parts of wing
construction. There are many nose and main ribs for the wings and fuel tanks
that need a fair amount of prep work before any assembly can begin. I will be
fluting, deburring and checking rib flanges for squareness to rib webs. I will
be doing all the ribs for both wings at this time This process will take a while
to complete so there will not be any exciting pictures to post.
