Right Wing

The right wing assembly is virtually identical to the left wing
assembly. There is no pitot tube in the right wing but I will be installing the
autopilot servo and an Angle-of-Attack
pressure port out on the right wing. Electrical for the lighting will
duplicate the left wing.

July 16, 2004
Set up the right spar on the H-frame. Feels good to finally be
starting on a new wing but space is getting cramped since I don't have any
storage for the left wing.
July 17, 2004
Drilled, countersank and riveted tank attach platenuts to top of
right spar. Countersank the screw holes for the platenuts.


July
19, 2004
Repeated the drilling process for the bottom of the right spar
for the tank attach platenuts. Also drilled and countersank for the access cover
platenuts.
July 20-22, 2004
Did a little more work on the left wing.
Go there.

August
3-5, 2004
Riveted the platenuts on the bottom of right spar for access
plate covers. Cleaned, acid etched, alodined and primed the countersunk holes
for the tank attach and access plate cover screws.

August
20, 2004
Prepared rear spar parts. Match drilled reinforcement fork,
reinforcement plates. Countersank fork where required for flush riveting.
Enlarged hole for aileron pushrod.


August 21, 2004
Cleco ribs to main and rear spar. Match drilled the ribs to the
spars. I used a bottle jack to support rear spar.


Match drill the inboard skin to the wing walk doubler. I drilled
and clecoed it directly to my work table (old door). Clecoed skins and wing walk
doubler to rib/spar skeleton.


August 22-23, 2004
Match drilled top and bottom wing skins to ribs.
